Thursday, 31 October 2013










Introduction

Nowadays usage of electrical power is enormous as a result of the population growth & infrastructure developments. 
In view of this, power generation has to be improved in multiples of what actually installed now. Also the power generation & distribution needs to be smart, reliable & more efficient.
By achieving this, the equipment installed in generation plants, substations & distribution networks needs to be tested as per standards & then commissioned to get a better power generation & utilization.

This blog deals with various testing procedures to be followed for equipment installed in substations, power plants & process plants.


Testing procedure for the following equipment are covered in this blog

3.     Power Transformers
4.     Circuit Breakers
5.     Isolators/Dis-connectors
6.     Wave Traps
7.     Surge Arresters
8.     HV Cables
9.     EHV Cables
10.  HV Switchgears
11.  LV Switchgears
12.  Protection Relays

Please give your valuable feedback for improving the contents.