Introduction
Nowadays usage of electrical power is enormous as a result of the population growth & infrastructure developments.In view of this, power generation has to be improved in multiples of what actually installed now. Also the power generation & distribution needs to be smart, reliable & more efficient.
By achieving this, the equipment installed in generation plants, substations & distribution networks needs to be tested as per standards & then commissioned to get a better power generation & utilization.
This blog deals with various testing procedures to be followed for equipment installed in substations, power plants & process plants.
Please give your valuable feedback for improving the contents.
Testing procedure for the following equipment are covered in this blog
3. Power Transformers
4. Circuit Breakers
5. Isolators/ Dis-connectors
6. Wave Traps
7. Surge Arresters
8. HV Cables
9. EHV Cables
10. HV Switchgears
11. LV Switchgears
12. Protection Relays